Gilmer holds meeting for Amicalola Falls Scenic Byway

News

ELLIJAY, Ga. – The Georgia Department of Transportation (GDOT) is moving forward with a project to designate a scenic byway between Gilmer, Pickens, and Dawson counties. Meetings are being held this month informing citizens about the byway and answering questions on the topic.

Each county is looking to hold one meeting for the the project, allowing their citizens an opportunity to attend a closer location.  The counties’ Boards of Commissioners have already approved the initial process of the designation for the byway. Gilmer approved it in November 2021.

Gilmer’s meeting, led by Janet Cochran, saw citizens attending and questioning the projects aims and benefits to the county and balancing them against the costs. Many citizens questioned whether the project might increase traffic on local and state roads as one of the main roads of the byway travels along Highway 52 between Dawson and Gilmer. However, the entirety of the byway involves several offshoots, loops, and branches of the route connecting small roads into it, roads like Orchard Lane.

But the inclusion of many of those side roads are part of the discussion as Executive Director of the Greater Gilmer Joint Development Authority (JDA) Kent Sanford said that is part of what they are asking citizens for. Sanford said that utilizing input from citizens who live in the area, they can not only offer suggestion or requests to move certain sections or alter the route in ways to provide the best scenario as well as offering suggestions on improvements to the route.

Scenic Byway

A map of the proposed Amicalola Falls Scenic Byway as presented in the July 2022 meeting with citizens.

That is part of the Georgia Rural Economic Development organization’s process in the byway designation. They will offer recommendations to government entities from local county commissioners to the state and GDOT on the needs of this route to both improve and maintain the scenic nature of the byway. Cochran said that this could be an increase in trash pickup, addition of certain things as a part of the Corridor Management Plan. However, the committee itself has no power to enforce or accomplish these tasks as they can only suggest them to the roads management.

This is all to maintain the six intrinsic qualities of a byway including scenic, natural, historic, cultural, archaeological, and recreational sites. Of which, the route being designated has five qualities. Only archaeological wasn’t found.

Being 81 miles long, the Amicalola Scenic Byway touches jurisdictions of Dawson County, Dawsonville, Gilmer County, Ellijay, Pickens County, and Jasper.

Cochran told citizens that the designation does not come with a widening of the road, construction, or other private property encroachments. There will be signs erected identifying the byway on the roadside, but no major expansions are included. On of the only restrictions that comes with the designation is no new billboards will be erected. Something that Sanford says Gilmer County already has in its ordinances.

Scenic Byway

A map of Gilmer’s portion of the Amicalola Falls Scenic Byway route proposed in the July 2022 meeting.

Gilmer’s meeting saw both opposition and support for the project as some suggested renaming it to include apples in the name and others worries about the state coming in to widen and control the roads. Still others spoke on the byway’s potential to add traffic to certain roads already under stress and in major need of repair. Countering that, some spoke about the byway’s plan to aid “market share,” a term used by Cochran, as draining tourists from the apple houses and directing them elsewhere. Similar discourse came in November 2021’s Gilmer BOC meeting as the board was questioned on the designation, its benefits, and “ulterior motives.”

In that meeting, Paris said he had begun thinking of something similar to this for Boardtown Road, though it would be a county designation and not a state designation.

Sanford said that the plan is to increase information and as people are likely to see the signs while already visiting the area. This could lead them to following the road after visiting apple houses and traveling in different directions instead of immediately returning via the same road after visiting their original destination. Cochran also assured citizens that the scenic byway doesn’t restrict their rights to develop their land along the road. As the county ordinances still dictate Land Use, citizens will not have any change in that area either. The county is also not required to fund any of the initial process of the designation. The meetings, information distribution, and even putting up the signs, if the designation is completed, is covered by Georgia’s Rural Center.

That process continues now, after this meeting, as the development of the Corridor Management Plan begins. Another meeting will be held to present that plan and it is sent to GDOT for approval and review by the DNR and DCA and then must be approved by the commissioner and board. If approved, it will join the 17 other Scenic Byways designated in the state. Citizens can find all scenic byways on the GDOT’s Scenic Byways page.

 

County supporting Hwy 136 and Hwy 183 Scenic Byway

News
Scenic Byway

ELLIJAY, Ga. – Joining in support with Dawson County and the Dawson County Chamber of Commerce, the Board of Commissioners voted in approval of supporting a “Scenic Byway” designation for a portion of Hwy 136 and Hwy 182.

The resolution indicates a route “that begins in the City of Dawsonville out Hwy 183 and Hwy 136, past Amicalola Falls State Park and over Burnt Mountain.” The Dawson County Chamber is asking for the Georgia Scenic Byway designation from the Georgia Department of Transportation for this route.

The Gilmer Board of Commissioners discussed benefits for supporting the agenda item and were questioned by citizens on the usefulness of it. In fact, according to Chairman Paris, a number of surrounding counties have already done this and support the scenic byway.

One citizen who spoke during the work session asked about the development footprint and ulterior motives of supporting the scenic byway and the level of state and federal involvement into the county.

Paris said that Gilmer was approached by other counties to join the designation. He stated, “We have no reason on this at all other than just offering cooperation to other counties. We’re not looking for it to impact our growth or tourism or anything else really. No ulterior motives at all.”

Parker also noted that not all of Hwy 136 is covered, rather only the part crossing Burnt Mountain. Hwy 136 continues on crossing Hwy 515 and turning north to cross into Gilmer County in the southwest corner.

The county has been approached numerous times over the years for what they have called “letters of support” for different things from the roundabout at Hwy 382 to trails in the county. Sometimes they require promises of future action and some do not. The board even mentioned this in the regular session as Paris said he was okay with the resolution as long as it didn’t commit the county to spending money.

However, while this is set for Hwy 136 and Hwy 182 in sections not within Gilmer, Paris did note during the Work Session that the he could be discussing with the other members of the BOC to initiate a similar designation for Boardtown Road. Most recently, Boardtown Road and its residents gathered to oppose plans of putting major power lines and poles along the road in a Georgia Transmission Corporation (GTC) project to upgrade power and stability in the area. This was one of those items in which the BOC offered a letter of support to aid in the actions of the community.

No member of the BOC mentioned anything further about Boardtown Road, but if the county does pursue the designation, certain protections could be imposed. According to the Georgia Department of Transportation under their benefits of the designation of a Scenic Byway, “If a community decides to emphasize the protection of scenic and natural areas, land use ordinances could be created to preserve the rural character of a byway and limit development intrusion. Scenic Byway designation is a unique tool, in that it can be used to achieve a wide variety of your community’s goals.”

Highway 382 Roundabout continues upgrades and completes demolition

News

ELLIJAY, Ga. – Gilmer County’s newest roundabout has hit two new milestones in the project as it continues along the over $8 million project.

roundabout

Despite a light rain shower, work continues on the landscaping for the 382 roundabout project on Friday, October 29, 2021.

With the rainy end to the week leading up to Halloween, the Georgia Department of Transportation’s Highway 382 connector project continued with minor additions. While the project has seen the demolition of the old section of 382 reach its very last stages, the main roundabout section is still seeing continuations.

Consistent rain has seen issues for the project, but this week saw workers on the roundabout planting shrubs and small trees despite the a light shower ongoing on Friday, October 29, 2021.

In addition to the interior of the roundabout, work continues for guardrails, road work, and lighting in the area among other things.

The project is already past its original estimated completion date, but could still see completion before Thanksgiving.

roundabout

Safety equipment is still in use for the construction project as lighting has yet to be turned on for the roundabout.

While the lighting is still yet to be turned on, the orange barrels and constructions signs remain to highlight the roundabout for drivers in the night. Additionally, the same is true for the Highway 515 intersection and barrels remaining in the area with the speed  limit remaining at 55 passing the connector.

Drivers are cautioned to remain aware of the new intersection and the use of the U-Turn lanes being utilized by drivers wishing to turn back towards Ellijay from Highway 382.

According to the Georgia Department of Transportation, the use of these u-turns instead of a direct left turn should help cut down on major accidents and drivers being struck in the side as they have seen in areas with low visibility and drivers crossing multiple lanes of traffic.

Highway 382 roundabout project now in use as final stages commence

News

ELLIJAY, Ga. – Highway 382 has seen construction on the roundabout project to connect a direct route to Highway 515 for nearly a year. The Georgia Department of Transportation project began in the latter half of 2019 despite the COVID-19 outbreaks and is still continuing today.

roundabout

A view from entering the roundabout from Highway 382 and heading towards Highway 515.

However, the project has hit the point now where all traffic has been moved from the old route passing directly beside Green’s Country Store to the new path curving off just past Dollar General, if you’re traveling towards Ellijay.

The stop signs at the old intersection have been removed and traffic is now fully engaging the roundabout with the Highway 382 extension in use as well.

Utilizing the extension that now crosses Old Highway 5, via the roundabout, and continues straight towards Highway 515 instead of merging with Old Highway 5 before a a small connector split off to intersect 515 at Powersports Drive.

roundabout

Construction continues into the final stages for the Old 5 and Highway 382 roundabout as it enters the final stages of construction.

The new direct path intersects Highway closer to town at the Gun Pro Shop. However, the intersection is not a traffic stop.

Instead, drivers traveling to 515 along the new connection are forced to turn right (Southbound) away from Ellijay before using a turn lane a few hundred feet down the road in order to turn back towards Ellijay.

The project reaches all the way back to 2016 when the Gilmer Board of Commissioners and the City of Ellijay received letters from GDOT about the coming project. Original seeking letters of support, discussion later turned towards lighting and maintenance costs for the roundabout itself as GDOT wanted the county or city to take over those costs while they continued paving maintenance for 382 itself.

roundabout

GDOT has been working on the roundabout project since last year, but plans began back in 2016 with letters to Gilmer County and the City of Ellijay.

Current understanding is that these are the remaining steps in the project as GDOT has put some lighting on the roundabout for night traffic, but it was not seen operational over the weekend.

While the project continues these steps and clean-up, the larger portion of the project is now complete and has begun traffic flow only in the last couple of days. GDOT stated earlier this year that expectations were to complete the project over the summer. The project has seen delays through weather over the last year, but no specific details are available at this time on whether returning COVID-19 numbers or increasingly heavy rainfall in some weeks were the cause of any major delays.

GDOT Pleads for Safe Back to School Driving in Northwest Georgia 

Announcements
Safe Driving for Back-to-School Season…
GDOT Pleads for Safe Back to School Driving in Northwest Georgia 

WHITE, Ga. – Students heading back to school means more traffic, increased congestion and the need for extra safety precautions. From school buses loading and unloading, to kids walking and biking, to parents dropping off and picking up – dangers abound.

As back-to-school gets into full swing, Georgia DOT urges drivers to put safety first – especially in and around school zones, buses and children.

  • Pay attention to school zone flashing beacons and obey school zone speed limits.
  • Obey school bus laws.
    • Stop behind/do not pass a school bus that is stopped to load or unload children.
    • If the lights are flashing and the stop arm is extended, opposing traffic must stop unless it is on a divided highway with a grass or concrete median.
  • Watch for students gathering near bus stops, and for kids arriving late, who may dart into the street. Children often are unpredictable, and they tend to ignore hazards and take risks.

According to the National Safety Council, most children who lose their lives in school bus-related incidents are four to seven years old, walking and they are hit by the bus, or by a motorist illegally passing a stopped bus.

“It’s never more important for drivers to slow down and pay attention than when kids are present – especially in the peak traffic hours before and after school,” said Grant Waldrop, district engineer at the DOT office in White.

Research by the National Safe Routes to School program found that more children are hit by cars near schools than at any location. Georgia DOT implores drivers to watch out for children walking or bicycling (both on the road and the sidewalk) in area near a school.

“If you’re driving behind a school bus, increase your following distance to allow more time to stop once the lights start to flash. The area 10 feet around a school bus is the most dangerous for children; stop far enough back to give them space to safely enter and exit the bus,” Waldrop explained.

Whenever you drive – be alert and expect the unexpected. By exercising a little extra care and caution, drivers and pedestrians can co-exist safely in and around school zones. Let’s make this new school year safer for our children. 

# # #

Construction to Begin Soon on State Route 382 Extension in Gilmer County

Announcements
For Immediate Release
Tuesday, June 4, 2019
On Time, on budget: Road Improvements Continue
Construction to Begin Soon on State Route 382 Extension in Gilmer County

ELLIJAY, Ga. – Work could begin soon on improving and extending State Route (SR) 382 in Gilmer County. Georgia DOT has just awarded a contract to C.W. Matthews Contracting CO, Inc. of Marietta, Georgia, valued at over seven million dollars for a project to widen and extend the highway.

The project will extend SR 382 from Old Highway 5 to SR 515 on new location for 0.35 mile. The proposed SR 382 would begin on new location just west of SR 515. A roundabout would be installed where the new roadway crosses SR 515, just south of the existing intersection of SR 382 and SR 515 and the new roadway would then extend in an easterly direction until it connects to SR 515. The SR 382 remnant would be closed and would become a cul-de-sac. The typical section will consist of two 12-foot travel lanes with 10-foot shoulders. There will also be two 6.5-foot paved bike lanes designed within the 10-foot shoulders to accommodate bike traffic. The total project length is approximately 0.822 mil.

“Upon completion, this project will improve the flow of traffic in the area, make it safer and help the public get where they need to go in Gilmer County,” said Grant Waldrop, district engineer at the Georgia DOT office in White.    

This reconstruction project is scheduled to be completed by the end of May 2021 at a construction cost of $7,452,228. Information on construction and lane closure schedules on this project will be forthcoming before work begins.

More details on this and other projects in the Department’s most recent bid awards are available via the Award Announcement Download at: https://www.bidx.com/ga/letting?lettingid=19041901.

The public is urged to “know before you go.” For real-time information on active construction, incidents and more, call 511 or visit www511ga.org before you get into your car.

Roadway work zones are hazardous for workers and for the public. In fact, most fatalities in work zones crashes are drivers or passengers. Obey the rules in work zones – Pay Attention – Slow Down – Watch for Workers.  And always, expect the unexpected. It can make the difference between life and death. Remember – work zone safety is in your hands.

# # #
Follow Us
Like Us
Website
The information you provide to the Georgia Department of Transportation will be used solely by GDOT. The Department does not sell or offer a subscriber’s personal information to third parties for marketing purposes. To no longer receive this e-news letter, please select “unsubscribe from this list” below.
Copyright © 2019 Georgia Department of Transportation, All rights reserved.

Our mailing address is:
Georgia Department of Transportation
District Six Office
30 Great Valley Parkway
White, GA 30184

Put your phone away and just drive: Hands-Free cell phone use is now the law drivers in Georgia

Press Release

Hands-Free cell phone use is law

Drive Alert Arrive Alive, Georgia!

CARTERSVILLE, Ga.—Just put down the phone and DRIVE! Hands-free cell phone use is now the law for drivers in Georgia. The Hands-Free Law (House Bill 673; Hands-Free Georgia Act), which went into effect on July 1, requires hands-free technology when drivers use cell phones and other electronic devices. Among other things, it is illegal for a driver to hold a phone in their hand or to use their body to support a phone. Penalties range from $50 and one point on a license for the first conviction to $150 and three points for the third and subsequent convictions.

Read Georgia Department of Transportation’s (GDOT) The EXTRA MILE blog post – Hands-Free Means Big Changes for the Better in Georgia – by guest author Robert Hydrick of the Governor’s Office of Highway Safety (GOHS). For additional information on the many facets of the law, visit http://www.headsupgeorgia.com/handsfree-law/.

“I am optimistic that Georgia’s new Hands-Free law will save lives,” GDOT Commissioner Russell R. McMurry. P.E. said. “I also want to emphasize how crucial it is for drivers and passengers to buckle up. Seatbelts truly save lives.”

Through its Drive Alert Arrive Alive campaign, GDOT has, for several years, called attention to an alarming surge in fatalities on Georgia’s roads after a decade of reductions. Many of these deaths are preventable. The campaign implores motorists to focus on driving, to not drive distracted and to wear a seatbelt to reduce the chance of serious injury or death if there is a crash. Visitwww.dot.ga.gov/DAAA.

While GDOT reports that, as of June 28, 2018, overall roadway fatalities are down 10 percent in Georgia from the same time last year, pedestrian deaths are up 22 percent. GDOT’s See & Be Seen campaign, the pedestrian component of Drive Alert Arrive Alive, emphasizes that pedestrian safety is a shared responsibility between motorists and pedestrians. Visit www.dot.ga.gov/SBS.

Summer construction roadwork is underway across Georgia. Before you get on the road, call 511 or visit www.511ga.org for real-time information about active construction, incidents and road conditions.Pay extra attention in work zones – slow down and watch for workers.  Work zone safety is everybody’s responsibility. 

Gilmer and Pickens Counties Awarded GDOT Contract

Community, Politics

ATLANTA – (May 30, 2018) | Senator Steve Gooch (R – Dahlonega) recently announced a $443,765 contract award to Gilmer and Pickens Counties from the Georgia Department of Transportation (GDOT). This is a part of the more than $112 million awarded to transportation projects statewide. The anticipated completion date for the project is January 31, 2019.

“I would like to thank GDOT and our local officials for coming together to address bridge rehabilitation in Gilmer and Pickens Counties,” said Sen. Gooch. “Addressing existing infrastructure by making improvements ensures our citizens are driving on safe and updated bridges. Driver safety remains a top priority and I believe projects like this are critical to moving our state forward when it comes to our citizen’s transportation needs. I will continue to work with GDOT to bring additional projects to our local communities.”

The project in Gilmer and Pickens Counties will address bridge rehabilitation on State Route (SR) 515 at six locations:

  1. SR 515-Nover CR 234- CSX RR – Gilmer County
  2. SR 515over CR 234- CSX RR – Gilmer County
  3. SR 515over SR 136 – Pickens County
  4. SR 515over SR 136 – Pickens County
  5. SR 515over Talona Creek – Pickens County
  6. SR 515over Talona Creek – Pickens County.

Full details for the project can be found at http://www.dot.ga.gov/applications/geopi/Pages/Dashboard.aspx?ProjectId=M005671.

Details on all projects awarded can be found through the Award Announcement Downloads link here.

Information on schedules, lane closures and detours will be made available on the Georgia DOT Website in advance of construction activities.

# # # #

Sen. Steve Gooch serves as Majority Whip of the Senate Majority Caucus. He represents the 51st Senate District which includes Dawson, Fannin, Gilmer, Lumpkin, Union and White counties and portions of Forsyth and Pickens counties.  He may be reached at 404.656.9221 or via email at [email protected]

Gooch: Senate Gets Down to Business

State & National

Senate Gets Down to Business

By: Sen. Steve Gooch (R – Dahlonega)

Although the Senate was in session for only two days this week, my colleagues and I were very busy under the Gold Dome addressing budget proposals and a key piece of legislation on the Senate Floor.

The week started with Joint Senate and House Appropriations hearings on the Amended FY18 and General FY19 budgets. Governor Deal kicked off the hearings which included several different agencies presenting their budget proposals. I am happy to say that the state’s budget continues to be in good shape, with the General FY19 budget topping $26 billion for the first time. The General FY19 budget proposals were drafted with an estimated 2.9 percent state fund growth and around 3.8 percent tax revenue growth over the Amended FY18 revenue estimates. Included in the General FY19 budget are increases in funding for education and transportation.

The General FY19 budget addresses the needs for the state to meet determined employer contributions within the Teachers Retirement System with a proposed increase of around $364 million. Additionally, around $120 million would be appropriated for enrollment growth and training. Along with these positive changes in the General FY19 budget, an important proposal in the Amended FY18 budget is adding $15 million to purchase 194 school buses statewide. This will positively impact our students by ensuring that buses are not overcrowded.

The state’s growing need to address transportation infrastructure is also addressed in the General FY19 budget. An additional $31.6 million in projected revenues resulting from House Bill 170 – passed during the 2015 Legislation Session – will be added to the Georgia Department of Transportation (GDOT) budget. I am very happy to see that a piece of legislation we passed a couple of years ago is still making positive impacts for GDOT.

Along with attending the budget hearings and carefully reviewing the proposals for the Amended FY18 and General FY19 budgets, my colleagues and I took up a very important piece of legislation in Senate Chamber. On Thursday, the Senate passed the Supporting and Strengthening Families Act, also known as the Adoption Bill, or HB 159. This bill passed with bipartisan support and is now headed over to the House of Representatives for their review. Final passage of this legislation and a signature into law by the Governor would allow our state to update our adoption system which has been the same for nearly 30 years.

The Senate’s version of HB 159 clarifies many of the laws regarding who can adopt, who can act as a legal guardian and the rights held by the biological parents before and after giving their child up for adoption. Additionally, the version the Senate passed on Thursday states that if an agency is not involved in a private adoptive process, living expenses cannot be paid. The only expenses that can be paid in a private adoption are medical and counseling. These are just some of the highlights of the Senate version of HB 159. As this legislation moves through the legislative process, my colleagues and I will work with the Governor and House of Representatives to ensure there is cooperation to address concerns anyone may have. It is imperative that we pass this legislation so that we can assist the large number of children who are in foster care and need a loving and stable home.

The pace of the session is going to pick up quickly with standing committees beginning to hold meetings next week to vet legislation pending from last year along with new bills introduced this year. As we move forward in the session, please do not hesitate to reach out with questions, concerns and feedback. It is always great to hear from my constituents and our door is always open.

A smoother ride in the works for drivers in Gilmer County

Press Release
For Immediate Release:
Tuesday, January 23, 2018
Contact: Mohamed Arafa 770.359.9523
District Six Communications

On Time, On Budget…

A smoother ride in the works for drivers in Gilmer County

ELLIJAY, Ga. – Work could begin soon on resurfacing State Route (SR) 515 in Gilmer County. Georgia DOT has just awarded a contract to Colditz Trucking, Inc. of Blairsville, Georgia, valued at nearly three million dollars for a construction project to resurface a 4-mile portion of the highway. The project includes 4.527 miles of resurfacing and shoulder rehabilitation on SR 515, beginning at DR 382 and extending to Maddox Drive in Gilmer County.

“This project and others like it in northwest Georgia add up to these two things- better mobility and a better quality of life for all the area’s residents,” said Dewayne Comer, district engineer at the Georgia DOT office in Cartersville.

This resurfacing project is scheduled to be completed by the end of November 2018, at a construction cost of $2,788,176. Information on construction and lane closure schedules on this project will be forthcoming before work begins.

More details on this and other projects in the Department’s most recent bid awards are available via Award Announcement Download at: https://www.bidx.com/ga/letting?lettingid=17121501.

The Georgia Department of Transportation continues its 2017 construction program.  Dozens of important roadway improvement projects are ongoing this summer throughout northwest Georgia as we work to deliver projects on time and on budget while keeping our transportation network the nation’s finest. Pardon the necessary inconvenience and please drive cautiously and safely at all times, especially in work zones.

The public is urged to “know before you go.” For real-time information on active construction, incidents and more, call 511 or visit www511ga.org before you get into your car.

Health and roads dominate Ellijay’s November council

Uncategorized

ELLIJAY, Ga – Prior to the Ellijay City Council’s November Meeting, they heard a proposal from Russel Brown, local paramedic, for a community welfare program similar to programs in other counties like Floyd County.

According to Brown, patients statistically do better recovering at home. This program would encourage and supervise home health. Different from home healthcare programs, Brown said much of the welfare program is focused on prevention of readmission to hospitals and emergency rooms. They would focus on aspects like vital signs and communication for paperwork. If the program moves forward, it would start out within the Ellijay City Limits.

Funding and grants are available, Brown said, and much of the expense would come from strips for glucometers to measure blood glucose. While he hopes one day it could grow into a community paramedic program, he wished to start at community welfare. Those providing the service would be limited in care, and Brown stated that EMS would still be called for necessary situations.

Specific details for the proposal will come possibly as early as the December City Council meeting as the council requested Brown to return with an official written proposal to detail more things like cost and liability among others.

Signs of Interest is proposing this sign change on behalf of the Gilmer Nursing Home and SunLink Health Systems.

Signs of Interest is proposing this sign change on behalf of the Gilmer Nursing Home and SunLink Health Systems.

Another healthcare entity presented a variance request to change the sign for Gilmer Nursing Home on 1362 South Main St.  While the variance request was submitted to exceed the three-foot sign regulation of the city, it would in fact be lower than the current sign. Standing at 21 feet now, the request states the new sign will only reach 12 feet in height. A representative from Signs of Interest, Andy Lawson, told FYN the sign change was partially to clean up the facilities appearance and simplify the extras to a lower “nicer looking sign.”

Officially approved by the council, the sign will include a small message board to be utilized by the nursing home. Lawson provided FYN with a drawing of what the sign is expected to look like. Though the sign change is indicative of a name change as part of a remodeling project, Lawson told the council that SunLink Health Systems still owns the nursing home.

The Georgia Department of Transportation is planning to abandon part of Highway 382 to rebuild it as a direct line to Highway 515.

The Georgia Department of Transportation is planning to abandon part of Highway 382 to rebuild it as a direct line to Highway 515.

Following the same road further south, Highway 382’s changes came to Ellijay with a formal notification by the Georgia Department of Transportation (GDOT) that they will abandon the section of Highway 382 that currently extends from the intersection of 382 and Old Highway 5 to the connection at Highway 515. As seen in the picture, GDOT will be constructing a new connector straight across to Highway 515 with a roundabout at the intersection.

The notification comes with the city of Ellijay needing to accept the abandoned portion of 382 into its responsibility for paving and maintenance. However, a motion was made at the meeting to table the item. Citizens can expect the council to revisit the issue in December.

Along with their discussion of roads, an official petition has reached the council to add speed bumps to Gilmer Street near the Senior Center. The petition garnered 20 names and roused discussion from the council about returning the street to a one-way street as well as discussion on purchasing speed bumps for the street. Continued complaints about the speed of vehicles on the street led to suggestions to officially request the change via petition. Discussion took a turn as Ellijay Police Chief Edward Lacey informed the council that the street was, at one time, a one-way street.

Gilmer Street is a more narrow street and discussion arose  as, if the city returned it to one way, they were unsure of which way to direct the traffic. The council tabled the item and requested an official recommendation from Lacey, on how to return it to a one-way street, to discuss along with the speed bumps option. Again, citizens should look for the council to revisit the item in December.

 

GDOT Work on 515 Slows Traffic

News
Officers direct traffic during the replacement of traffic lights at East Ellijay's 1st Avenue and 515 intersection.

ELLIJAY, GA – For those traveling on Highway 515, you may have been noticing trucks at the intersection of 1st Avenue near Hardee’s.

GDOT workers prepare the 1st Avenue intersection of 515 for new traffic lights.

GDOT workers prepare the 1st Avenue intersection of 515 for new traffic lights.

The Georgia Department of Transportation (GDOT) has changed out the traffic lights with newer models including a flashing yellow turn signal for left turns at the intersection.

Many citizens who have been to Pickens county will recognize the same style of traffic lights as are in use on 515 there. According to Mack Wood, City Planner of East Ellijay, the lights were originally a test in Jasper as a cost alternative to completely remodeling the intersections.

A welcome change to many citizens as they get stuck in those turning lanes on the way to and from work, the new lights have overcome several hurdles to installation. Requiring the removal of trees along the median near the intersection was just the first hurdle as the city has had to have wire repairs in the lighting system and further work to prepare for the change.

This is the only intersection on 515 in Gilmer that will receive the update after Wood originally contacted GDOT for the updates. Stating a sight distance issue, this means the intersection of Maddox Drive and 515 at the BP and McDonald’s and the intersection in front of Wal-Mart will not be seeing their light change anytime soon.

 

Road Projects and Grants Get Underway

News

Gilmer County is currently undertaking a large re-striping project both on their own and with the Georgia Department of Transportation (GDOT) in addition to this summers LMIG.

Originally, Gilmer applied every year for its Local Maintenance and Imporvements Grant (LMIG) for paving. The $629,234.66 grant, along with the counnty’s $270,025 match, will pave Burnt Mountain Road (6.5 miles), Mountaintown Road (4.65 miles), and Sunlight Road (3.1 miles). This grant will also cover fresh new striping and new signs on all three roads.

In addition to that original project, Gilmer also applied for an “Off-System Safety Program Grant” of $250,000 to add nine more roads as a separate project for striping and small additions such as guard rails and signage according to Commission Chairman Charlie Paris. Those roads include Boardtown Road, Big Creek Road,  Double Head Gap Road,  Turniptown Road, Knight Road, Tails Creek Church Road, and Progress Road with Clear Creek Road and Yukon Road to also be done after the Atlanta Gas Light construction on those two roads is completed.

This project will be fully managed by GDOT through it’s own contracts. However, citizens may not see the work being done on these roads as the striping work is being conducted at night. According to Paris, the night work for this striping is set to help avoid any traffic congestion for citizens as they go about their regular days for work and around town.

Finally, a third application for up to $100,000 has been made by Gilmer that was not included in either project. The project was put forth to Gilmer’s Road Department by Chairman Paris.

According to Public Works Director Jim Smith, this “Supplemental LMIG” currently includes Homer Wright Road and Whitepath Road and is being undertaken by the County itself. Now, while Smith assured citizens in a recent meeting that these two roads will see completion by April 26th, he also told FYN that further projects could be added to the grant later. This project, like the original LMIG, requires a 30% match from the County that Paris stated would be covered in the Road Department’s budget.

With one project almost complete and more underway, citizens should be noticing improvements to our roads lines in the coming months.

 

Georgia DOT Contracts Awarded for Senate District 51

Press Release

 

Press Release

 

Contact:           Ines Owens, Acting Director

[email protected]
404.656.0028

 

Georgia DOT Contracts Awarded for Senate District 51GDOT

 

ATLANTA (January 25, 2017) | The Georgia Department of Transportation (GDOT) awarded approximately $8.6 million for road projects in Senate District 51 as part of a $54 million statewide construction and maintenance upgrade. Projects for Senate District 51 were announced as part of the 2016 November and December awards.

 

“Maintenance and upgrades for existing roads continue to be a critical issue for our local communities,” said Senator Steve Gooch(R – Dahlonega). “I commend GDOT for acknowledging the needs within our community and awarding projects to Senate District 51. These projects will increase safety, decrease congestion and ensure that existing infrastructure needs are met.”

 

Dawson County was awarded a project totaling around $3.8 million. This funding will go toward construction of a roundabout on State Route 53 at State Route 183. The anticipated completion date for this project is May 31, 2018.

 

A project totaling around $4.5 million was awarded to address approximately 53 miles of plant mix resurfacing and surface treatment paving at five locations across Fannin and Pickens Counties. These upgrades will be completed by November 30, 2017. Along with this award, Pickens County was awarded an additional project totaling $292,243. This project will increase safety throughout the county by funding signing and pavement marking upgrades at railroad crossing location throughout the county. The anticipated completion date for these projects is May 31, 2018.

 

Information on schedules, lane closures and detours will be made available on the Georgia DOT Website in advance of construction activities.

 

Details on all projects awarded can be found through the Award Announcement Downloads link at https://www.bidx.com/ga/letting?lettingid=16052001. Click on Award Announcement on the right.

 

# # # #

Sen. Steve Gooch serves as Majority Whip of the Senate Majority Caucus. He represents the 51st Senate District which includes Dawson, Fannin, Gilmer, Lumpkin, Union and White counties and portions of Forsyth and Pickens counties.  He may be reached at 404.656.9221 or via email at [email protected].

Georgia DOT Contracts Awarded for Senate District 51

Uncategorized

 

Press Release

 

Contact:           Ines Owens, Acting Director

[email protected]
404.656.0028

 

Georgia DOT Contracts Awarded for Senate District 51GDOT

 

ATLANTA (January 25, 2017) | The Georgia Department of Transportation (GDOT) awarded approximately $8.6 million for road projects in Senate District 51 as part of a $54 million statewide construction and maintenance upgrade. Projects for Senate District 51 were announced as part of the 2016 November and December awards.

 

“Maintenance and upgrades for existing roads continue to be a critical issue for our local communities,” said Senator Steve Gooch(R – Dahlonega). “I commend GDOT for acknowledging the needs within our community and awarding projects to Senate District 51. These projects will increase safety, decrease congestion and ensure that existing infrastructure needs are met.”

 

Dawson County was awarded a project totaling around $3.8 million. This funding will go toward construction of a roundabout on State Route 53 at State Route 183. The anticipated completion date for this project is May 31, 2018.

 

A project totaling around $4.5 million was awarded to address approximately 53 miles of plant mix resurfacing and surface treatment paving at five locations across Fannin and Pickens Counties. These upgrades will be completed by November 30, 2017. Along with this award, Pickens County was awarded an additional project totaling $292,243. This project will increase safety throughout the county by funding signing and pavement marking upgrades at railroad crossing location throughout the county. The anticipated completion date for these projects is May 31, 2018.

 

Information on schedules, lane closures and detours will be made available on the Georgia DOT Website in advance of construction activities.

 

Details on all projects awarded can be found through the Award Announcement Downloads link at https://www.bidx.com/ga/letting?lettingid=16052001. Click on Award Announcement on the right.

 

# # # #

Sen. Steve Gooch serves as Majority Whip of the Senate Majority Caucus. He represents the 51st Senate District which includes Dawson, Fannin, Gilmer, Lumpkin, Union and White counties and portions of Forsyth and Pickens counties.  He may be reached at 404.656.9221 or via email at [email protected].

Proposed Joint Sign – Apple Capital & Mountain Biking Capital

News

Previously fetchyournews.com reported on a proposed signage change which would replace two signs on Hwy 515. (more…)

Back to Top